Thursday 13 February 2014

More drainage completed

Yet more drainage installed in and around the 13th green, we added a new pipe underneath the green and connected it to an existing pipe and also added a new drain on the right hand side of the apron stripe (just off the green), hopefully collecting some of the surface water running down the bank and on to the green. With now 4 new pieces of drainage installed the 13th green should be a lot drier in the wet winter months.








No comments:

Post a Comment