The spring of 2015 was particularly cold and this created problems in getting the course up to the desired condition early. Although the greens were performing well it was late May before I was completely satisfied with the greens surfaces. It was a problem experienced by most golf clubs across the country and in fact we seemed to create better surfaces earlier than most. Once temperatures improved we quickly got up and running and remaining weather patterns for the year have been quite conducive to creating good playing surfaces. Only for a short period in July did the course become a little too dry and bouncy.
Greens Management
I have been happy most of the year with the way the greens have performed. Once again we have met our targets for speed, trueness, smoothness and uniformity.
The fairy rings again provided our biggest challenge but I feel we are managing these better year on year and are minimising the impact of these (which are mostly aesthetic) well.
The 1st green remodelling has worked well and water no longer puddles in the middle of the green after heavy rainfall. There has been a tiny amount of sinkage to the left hand side which may require reworking but it is only a minor problem and will not result in any disruption to play.
As I sit here writing this in early November it is currently 17 degrees outside and whilst good for golfing it is providing its own challenges on the golf course. Disease levels are high and are requiring more chemical control than in previous years to maintain the smoothness of the surfaces. We are also currently mowing greens three times per week, when once would normally suffice.
Green Surrounds
We are still working hard to improve the immediate area around each green. In September these areas were hollow cored, overseeded and heavily dressed with sand. Improvement has been huge, with a much better sward of finer grasses colonising. Further work in the future will result in the surfaces I desire.
Long Rough Management
The cut and collect machine was used this year to give an extra 5 metres of cut rough around most holes and proved to be a great benefit to playability. Sheep, currently numbering 38, are continuing to graze the heavy rough areas and appear to be having the desired effect. The areas are slowly becoming less dense and the coarser grasses are refining.

Gorse
Around 200 plants have recently been transplanted between holes 1 and 2, 8 and 9, and the 9th on the Blenheim course. A further plantation will be planted on the 13th to deter players from playing across the corner. Stakes and guards are continually being removed as the larger plants mature so please ensure you are entitled to relief before doing so. 200 more plants are being grown on for planting in autumn 2016.
For further information on golf course maintenance please view our blog, compiled by Deputy Head Greenkeeper Steve Hirons at www.kirtlingtongreenkeepers.blogspot.co.uk

Saturday 14 November 2015

15-11-15 latest news on the course!!

A very busy few weeks on the course with the grass still growing and the usual autumn work being carried out.
All bunkers on the main 18 have been strimmed, weeded and edged while plans have been put in place to re-shape and tidy up the bunkers on the Blenheim course and also a couple on the main 18.
Blenheim greens have been micro tined this week along with the usual weekly slitting of all 27 greens.
Tees are still getting cut twice a week while the greens are three times weekly at the height of 5mm.
Greens have been sprayed with micro nutrients,  root enhancers and also a turf hardener.






Thursday 5 November 2015

Nov 15


Darker dewy mornings are now here, so lots of brushing and slitting of greens present along with lots of solid tining of tees and wet areas!
This time of the year with the current weather is perfect for disease so we are keeping a very close eye on the greens each morning. A contact and systemic Fungicide will be sprayed as soon as disease appears.
We are currently also spraying for worms as casting is getting a bit messy in certain areas.