Wednesday 27 February 2013

New drainage installed around the 2nd tee to hopefully solve the problem of surface water during wet winter months.









2 comments:

  1. Drainage Process- We firstly found the level and the fall we did this with the laser. We then used the turf cutter to remove the turf, followed, then by digging the ditch to the correct fall checking the level as we we're going along.. We then put in place our piping (75mm) followed by the gravel (20mm) up to the top of the ditch. We then re-turfed leaving a small gap where the gravel would run level to our turf. Hopefully this should make a big difference in the winter months with the standing water around our 2nd tee..

    ReplyDelete
  2. Oh and yes brett is feeling the cold on the first photo :)

    ReplyDelete